- Sample Type & Phase
- Dry or moisture-bearing industrial gas in a stable single-gas phase. Provide the complete gas composition and identify possible water, hydrocarbon, glycol, methanol, particulate, aerosol, or corrosive carryover.
- Measurement Range
- Select one manufacturer range and Version A, B, or C. State the normal and worst-case water dew point or moisture concentration, required units, pressure basis, alarm points, and whether supplemental cooling is required.
- Sample Conditions
- Provide source pressure, measurement pressure, normal and maximum temperature, expected flow availability, ambient range, composition, contaminant loading, and the required sample-disposal destination.
- Sample Handling
- Define the extraction point, tubing material and length, pressure reduction, filtration, fast-loop or bypass arrangement, flow control, calibration connection, and measures that prevent upstream condensation or ambient moisture ingress.
- Installation Area
- Confirm indoor or outdoor location, hazardous-area classification, ambient temperature, sun and rain exposure, available shelter or panel space, maintenance access, and the safe-zone boundary for ancillary equipment.
- Utilities
- Provide 20-27 VDC power and any supplemental-cooling utilities required by the selected range. Confirm grounding, cable entries, isolation, drainage, and sample vent or return provisions.
- Response Requirement
- State the required process-response time, distance from the sample point, fast-loop availability, alarm delay, and acceptable stabilization time following start-up or a process change.
- Integration Requirement
- Define 4-20 mA scaling, Modbus RTU communications, alarm contacts, tag naming, engineering units, historian requirements, control-system ownership, and any local indication.
- Commissioning Requirement
- Confirm the required leak test, flow and pressure checks, mirror inspection, cooling test, output and alarm simulation, Modbus verification, reference comparison, training, and commissioning records.